Information of Tendering
a. Tender Announcement Number: P24-97A1-010/0
b. Product Name and Specifications: Main equipment for Yeongdong Yangsu Unit 1 and 2 (2 units, 250MW each)
c. Scope of Supply: Pumps/turbines, generators/motors, control equipment and auxiliary equipment, installation and construction, etc. (refer to the technical specifications)
d. Budget Amount: ₩311,324,000,000 (Three hundred eleven billion, three hundred twenty-four million Korean Won, excluding VAT)
e. Delivery Deadline: (Unit 1) March 31, 2031 / (Unit 2) June 30, 2031
f. Delivery Conditions: Installation at the construction site and performance test conditions
g. Defect Warranty: 5 years from the notice of acceptance for each unit (5%)
h. Other Conditions: Compliance with the tender documents, including the tender instructions, technical specifications, proposal requests, standards for contracts through negotiations, and detailed evaluation criteria for proposals
i. Special Notes: If the competitive bidding is failed once, a negotiated contract can proceed even without a re-announcement of the tender.
○ Basis: Ministry of Strategy and Finance Notice No. 2024-29 (Notice on the Temporary Special Measures for the Enforcement Decree of the Act on Contracts to Which the State is a Party, July 1, 2024) / Special Measures Application Period: Until December 31, 2024.